
The leveler is installed just as it would be in a Beaver Dam application. The leveler serves as a relief valve protecting the dam from erosion and overflow damage. The caged intake device helps to protect the system from clogging and settling into the sediment.
Thousands of dollars could be wasted on the construction of a new pond, if the dam is washed out by a large rainfall. By passing water under/through the dam using the MINNCOR Leveling System, the water level is kept from spilling over the top and therefore, erosion problems can be managed.
By using the elbow and riser pipe, you can control the height, and ultimately, the size of your pond. These are included in the leveler kit package. |